Industrial Air Curtain
3 Maintenance
Version 1.5, English (19-01-2007) 19
3.4.2 Annual maintenance
- Perform all monthly checks.
- Check the cabling between the terminal
boxes in the units and the control unit.
- Check the casing, the hanging or fixing
construction, and the securing of each
unit.
- Check if the fans are mounted correctly
and are not running out of true. If
necessary, fasten them again.
For units with electric heating:
- Check the wiring between the control unit
and the heating section.
- Check the feeder cables and the
connections in the heating section.
- Check the relays in the heating section.